TCV
Total Contract Value ($)
$134,000
WA
Working Area (sqft)
2,100 sqft
δ
Demolition Ratio (0–1)
0
0.5
1.0
Press & drag the ● node
0.10 (+10%)
P
Permitting/Licensing Days
30 days
r
Materials Days / Site-Week
0.25
~1.6
3.0
Press & drag the ● node
1.00
ω
Overlap (0=parallel, 1=sequential)
0
0.5
1.0
Press & drag the ● node
0.50
Estimated Schedule
0.00 months (rounded to half-weeks)
0.0 site-weeks
Estimated on-site capacity
$0/day
Estimated on-site days
0.0 days
Materials waiting (rounded)
0 days
Permits + materials wait
0.0 days
Working-area factor
1.00×
Demolition factor
1.00×
Weeks before rounding
0.0
Scheduled weeks
0.0
Tip: “Overlap” lets permit time and material waits happen at the same time when possible.